Pipeline · Bill → Law
Step 1
Introduced
Feb 24, 2023
Step 2
Referred
Mar 22, 2023
E&C · Natural Resources · T&I
Step 3
Committee
Step 4
House floor
Step 5
Senate
Step 6
Resolve Changes
Step 7
Signed
SummaryCRS Summary
This bill requires the President to obtain the approval of Congress before revoking a permit or other authorization required under executive orders for constructing, connecting, operating, or maintaining an oil or natural gas pipeline, an electric transmission facility, or a border-crossing facility.
Timeline · 7 actions
Mar 22, 2023
Referred to the Subcommittee on Energy and Mineral Resources.
Mar 3, 2023
Referred to the Subcommittee on Energy, Climate and Grid Security.
Feb 27, 2023
Referred to the Subcommittee on Railroads, Pipelines, and Hazardous Materials.
Feb 24, 2023
Introduced in House
Feb 24, 2023
Referred to the Committee on Transportation and Infrastructure, and in addition to the Committees on Energy and Commerce, and Natural Resources, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
Feb 24, 2023
Referred to the Committee on Transportation and Infrastructure, and in addition to the Committees on Energy and Commerce, and Natural Resources, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
Feb 24, 2023
Referred to the Committee on Transportation and Infrastructure, and in addition to the Committees on Energy and Commerce, and Natural Resources, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.