Pipeline · Bill → Law
Step 1
Introduced
Apr 20, 2023
Step 2
Referred
Apr 20, 2023
E&C
Step 3
Committee
Step 4
House floor
Step 5
Senate
Step 6
Resolve Changes
Step 7
Signed
SummaryCRS Summary
This bill establishes requirements concerning (1) the equitable allocation of costs for electric grid upgrades; and (2) the deployment of grid enhancing technology or equipment that increases the capacity, efficiency, or reliability of a transmission facility or transmission system. Specifically, it directs the Federal Energy Regulatory Commission (FERC) to issue regulations that require public electric utilities to allocate the cost of upgrades to the electric grid, such as upgrades to interconnect renewable generation projects, among all customers that benefit from the upgrades. In determining which parties benefit, FERC must consider all material benefits of the network upgrade, includin...
Timeline · 2 actions
Apr 20, 2023
Introduced in House
Apr 20, 2023
Referred to the House Committee on Energy and Commerce.