Pipeline · Bill → Law
Step 1
Introduced
Nov 29, 2023
Step 2
Referred
Dec 1, 2023
E&C · T&I
Step 3
Committee
Step 4
House floor
Step 5
Senate
Step 6
Resolve Changes
Step 7
Signed
SummaryCRS Summary
This bill directs the Department of Transportation (DOT) to complete a study assessing the potential and existing use of pipelines constructed with composite materials to safely transport hydrogen and hydrogen blended with natural gas. In completing the study, DOT must hold a public meeting with interested stakeholders, release a draft version of the study for public comment, and address any substantive comments submitted during the public comment period. DOT must present the study's findings at a public meeting. Within 18 months of the public meeting, DOT must issue a rulemaking to allow for the use of composite materials for pipeline transportation of hydrogen and hydrogen blended with na...
Timeline · 5 actions
Dec 1, 2023
Referred to the Subcommittee on Energy, Climate and Grid Security.
Nov 30, 2023
Referred to the Subcommittee on Railroads, Pipelines, and Hazardous Materials.
Nov 29, 2023
Introduced in House
Nov 29, 2023
Referred to the Committee on Transportation and Infrastructure, and in addition to the Committee on Energy and Commerce, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
Nov 29, 2023
Referred to the Committee on Transportation and Infrastructure, and in addition to the Committee on Energy and Commerce, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.