Pipeline · Resolution
Step 1
Introduced
Mar 22, 2023
Step 2
Referred
Mar 22, 2023
Foreign Affairs
Step 3
Committee
Step 4
House floor
SummaryCRS Summary
This resolution expresses the sense of the House of Representatives that Canada should not allow construction of a nuclear waste repository within the Great Lakes Basin and that the President and the Department of State should work with Canada to prevent such construction and craft a long-term solution for nuclear waste storage that does not threaten the Great Lakes.
Timeline · 2 actions
Mar 22, 2023
Introduced in House
Mar 22, 2023
Referred to the House Committee on Foreign Affairs.