118th Congress · SENATE BILLBILL

S. 4190Expediting Generator Interconnection Procedures Act of 2024

A bill to require the Federal Energy Regulatory Commission to promulgate regulations that accelerate the interconnection of electric generation and storage resources to the transmission system through more efficient and effective interconnection procedures.

Energy
Introduced Apr 18, 2024
Last action Apr 18, 2024
Pipeline · Bill → Law
Step 1
Introduced
Apr 18, 2024
Step 2
Referred
Apr 18, 2024
Energy and Natural Resources
Step 3
Committee
Step 4
Senate
Step 5
House floor
Step 6
Resolve Changes
Step 7
Signed
SummaryNo summary available

No CRS summary available for this bill.

Provisions · 3 sectionsIntroduced in Senate
Timeline · 2 actions
Apr 18, 2024
Introduced in Senate
Apr 18, 2024
Read twice and referred to the Committee on Energy and Natural Resources.