119th Congress · HOUSE BILLBILL

H.R. 4705ACHE Act of 2025

To place a moratorium on the issuance and renewal of certain Federal authorizations for mountaintop removal coal mining until a health study is conducted, and for other purposes.

Environmental protection
Introduced Jul 23, 2025
Last action Jul 24, 2025
Pipeline · Bill → Law
Step 1
Introduced
Jul 23, 2025
Step 2
Referred
Jul 24, 2025
E&C · Natural Resources · T&I
Step 3
Committee
Step 4
House floor
Step 5
Senate
Step 6
Resolve Changes
Step 7
Signed
SummaryNo summary available

No CRS summary available for this bill.

Provisions · 7 sectionsIntroduced in House
AI
AI
AI
AI
AI
AI
Timeline · 5 actions
Jul 24, 2025
Referred to the Subcommittee on Water Resources and Environment.
Jul 23, 2025
Introduced in House
Jul 23, 2025
Referred to the Committee on Natural Resources, and in addition to the Committees on Energy and Commerce, and Transportation and Infrastructure, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
Jul 23, 2025
Referred to the Committee on Natural Resources, and in addition to the Committees on Energy and Commerce, and Transportation and Infrastructure, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
Jul 23, 2025
Referred to the Committee on Natural Resources, and in addition to the Committees on Energy and Commerce, and Transportation and Infrastructure, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.