Pipeline · Bill → Law
Step 1
Introduced
Jan 22, 2025
Step 2
Referred
Jan 23, 2025
Natural Resources · T&I
Step 3
Committee
Step 4
House floor
Step 5
Senate
Step 6
Resolve Changes
Step 7
Signed
SummaryCRS Summary
This bill requires Federal Columbia River Power System (FCRPS) operations to be consistent with the preferred alternative in a 2020 environmental impact statement (EIS) decision that focuses on the operations, maintenance, and configuration of dams in the system rather than wild fish restoration. The system includes dams in the Columbia and Snake rivers in Oregon, Washington, Montana, and Idaho. Specifically, the Bureau of Reclamation, the Bonneville Power Administration, and the U.S. Army Corps of Engineers must operate the FCRPS consistent with the Columbia River System Operations Environmental Impact Statement Record of Decision dated September 2020. Thus, Reclamation, the Bonneville Pow...
AI
AI
AI
Timeline · 4 actions
Jan 23, 2025
Referred to the Subcommittee on Water Resources and Environment.
Jan 22, 2025
Introduced in House
Jan 22, 2025
Referred to the Committee on Natural Resources, and in addition to the Committee on Transportation and Infrastructure, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.
Jan 22, 2025
Referred to the Committee on Natural Resources, and in addition to the Committee on Transportation and Infrastructure, for a period to be subsequently determined by the Speaker, in each case for consideration of such provisions as fall within the jurisdiction of the committee concerned.